The hot water boiler is ready for commissioning.

The 400,000 kcal/h capacity hot water boiler will operate at 125°C with a temperature difference of 7°C. Along with our boiler; natural gas burner, circulation pumps, control panel, nitrogen cushioned balance tank, and feed tank have been shipped. Our boiler will serve in the Uzbekistan chips factory.