Nazar Kimya moved to new plant in Tuzla, Istanbul Anatolian side OSB and selected EROGLU ISI AS for 2,000,000 kcal / h capacity hot oil boiler. Hot oil boiler and all equipments EROGLU ISI A.Ş. procured, assembled and assembled. After the installation of the products in the boiler room and after the installation, the system was delivered to our customers at work.
|