In Mauritania, a steam boiler with a capacity of up to 10 ton / hour was shipped to the fish processing plant. Along with the steam boiler, you can also install a heavy oil burner, a fuel preparation system, a degasser and a self-sustaining boiler. After approximately 40 days of sea cruise, the boiler will arrive at the port of lima and will be commissioned by the expert staff of EROĞLU ISI A.Ş.
|