Boilers to go to Romania are ready.
4 ton/h 15 bar, 3 ton/h 12bar, 1500 kg/h 12bar 3 pass flame smoke tube 3 boilers are ready for shipment. Boilers are manufactured, inspected and CE certified in accordance with the 2014/68 directive, EN 12953.
We wish all the best to our client.     
|